A hardworking and motivated professional who is seeking for a challenging environment as a Planning Engineer, where I can use my so far learnt skills and catch myself improving in each aspect of Project Management. Further playing my role in achieving the set goals and adding value to the organization.
Client: Eighteen IslamabadPMC: Mace Group
Consultant: Meinhardt Pakistan (Pvt) LtdHill International Management Consulting CompanyProjects:1. Construction of Grey Structure and Common Area Finishes of Pavilion 6&7 [Vertical Construction]2. Construction of Grey Structure and Common Area Finishes of Mockup Villas3. Construction of Grey Structure and Common Area Finishes of Pavilion 04 [Vertical Construction]4. Construction of Grey Structure and Common Area Finishes of Cluster-G (G1 & G2) (168 Villas) [Horizontal Construction]5. Construction of Secure Tech Consultancy Head Office Building at I-9 Islamabad [Vertical Construction]Major Responsibilities:• Primavera: Scheduling & Planning, Revised Schedules, EOTs, Recovery Schedules &Mitigation Schedules.• Forecasting Cash Flow and Progress S-Curves.• Project Catch-up Plans & Forecast Schedules.• Delay Analysis and Window Analysis based on Delay events.• Preparing project Weekly and Monthly Reports.• Schedule meetings with Client and Consultant on Progress Updates and Understanding ofContractual Agreements.• Resource loading and Cost Estimation, Quantity Surveying and Assurance.• Communicating with project teams ensuring timely execution of Project deliverables.• Corrective and Preventive Action Plans.• Making sure the execution of construction activities as per codes and drawings.• Responsibilities including solving technical issues, technical assistance & project reporting.• Finalizing BOQs and Tender documents.
Client: Pakistan Telecommunication Company LimitedProjects:1. Civil Works for PTCL Exchange, Bahria Town, Islamabad2. Civil Works for PTCL Exchange, Saddar3. Civil Works for PTCL Wireless and Officer Colony
Major Responsibilities:• Coordinating project updates with client and responsible for timely execution of Projectdeliverables.
• Preparation project Schedules and Monthly Reports.• Preparation and Finalizing BOQ Docs.• Submission of Tender Docs.• Resource Estimation, Planning of Project Schedule and Risk assessment.• Responsible for execution of Project deliverables.• Making sure the execution of construction activities as per codes and drawings.• Preparation and presentation of fortnight reports of the executed schedule to client.
Client: Kohat Cement Company LimitedProject:Civil Works for 7800 TPD Grey Cement Production LINE IV, Kohat Cement Company LimitedProject Description: Casted: 1864 Piles• Building & Pilling works for the construction of 7800 TPD Clinker Production, LINE IV offollowings structures is under scope.• Cement Packing & Dispatch Line III• Cement Packing & Dispatch Line IV• Coal Pre-Blending & Transport Line IV• Circulating Water tanks & Pump Station Line IV• Gypsum/Additive Crushing & Conveying Line IV• Cement Mill, Electrical Room Line IV• Cable Tunnel & Trenches Line IV• Structural Excavation & Back Filling, Structural Steel, Cement Concrete, Embedded parts andmiscellaneous works as per drawing specification.Major Responsibilities:• Planning, coordinating and monitoring site activities.• Attending meetings for planning construction activities & timelines on P6• Reporting % completion, cost variations & overturns upon Weekly & Monthly basis.• Preparation and sorting out of Technical documents & queries with Project Manager.• Ensuring all procedures, construction works, and documentation as per contract, designstandards & project technical specifications.• Inspection and expedition of site activities as per schedules.• Assisting Project manager in preparation of project related documentations (MOMs, finalizingIPCs, Periodic Reports, Handing Over docs etc.)• Ensuring HSE Policies and Standards• Responsible for Man, Material, Tools, Equipment planning, Resource and Project estimation.• Responsible for Tendering and preparation of Bidding Documents and BOQs.• Analysis & Pre-Bid Meetings.
Client: Pioneer Cement LtdProject: 7700 TPD Clinker Production LINE III
Project Description: Pilling works for the construction of 7700 TPD Clinker Production, LINE III.
Casted: 839 Piles
• Drilling & Boring of Working Piles using Hydraulic Auger Rotary Drilling Method.• Fabrication & placing reinforcement steel cages into predrilled pile boreholes.• Providing, Mixing, handling, pouring with Trimme method, cement concrete with min cubestrength at 28 days confirming C-35 MPa.• Low Strain" Method for integrity investigation of concrete Piles/Sonic Integrity Test (SIT)